Contracting with discretionary bonuses

econ.TH arXiv:2511.23424
View PDF arXiv JSON

Abstract

We study a continuous time contracting model in which a principal hires a risk averse agent to manage a project over a finite horizon and provides sequential payments whose timing is endogenously determined. The resulting nonzero-sum interaction between the principal and the agent is reformulated as a mixed control and stopping problem. Using numerical simulations, we investigate how factors such as the relative impatience of the parties and the number of bonus payments influence the principal's value and the structure of the optimal bonus payment scheme. A notable finding is that, in some contractual environments, the principal optimally offers a sign-on bonus to front-load incentives.